NTM 11/2024 Laying of Freshwater Pipes within the Boundaries of Sila Port
16/05/2024
487.70 KB
NTM-04-2024 Visual inspection operation for Sheikh Khalifa Bridge – Zayed Port (Cancelled)
30/01/2024
384.07 KB
NTM 02-2024 Sea Trials of a Remotely Operated Boat-Zayed Port (Cancelled)
25/01/2024
829.83 KB
NTM-20-2023 Seismic Survey Operations – Zayed & Musaffah Ports (Cancelled)
13/12/2023
912.05 KB
NTM 19-2023-Temporary Suspension of Marine Operations at Old Free Port (Cancelled)
11/12/2023
762.68 KB
NTM 18-2023-Extension of Remotely Operated Boat Sea Trials Zayed Port (Cancelled)
07/12/2023
493.72 KB
NTM 15/2023 DRP-Deployment of Environmental buoys within Mugharraq Port
03/10/2023
706.14 KB
NTM-14-2023-Amendment of Sas Al Nakhl Bathymetric Survey Zayed Port (Cancelled)
28/09/2023
489.29 KB
NTM 13 – 2023 Autonomous Boat Sea Trials and Testing Musaffah Channel (Cancelled)
21/09/2023
481.07 KB
NTM 12-2023-ZP Marine Bathymetric Survey Operations in Sas Al Nakhl Channel (Cancelled)
19/09/2023
781.24 KB
NTM 11/2023 Al Dhafra Region Ports – Deployment of Mooring Buoys at Mirfa Port
01/09/2023
786.04 KB
NTM 07-2023-ZP-Sas Al Nakhl channel Marine Bathymetric Survey Operations (Cancelled)
22/06/2023
720.57 KB
NTM 06-2023-ZP-Removal of existing break water from Al Saadiyat (Cancelled)
22/06/2023
839.56 KB
NTM 04/2023 Hudayriyat – Musaffah Causeway Vessels Transit. Reopening of the Old Musaffah Navigational Channel/Khour Al Bateen. (Measures and Restrictions)
09/03/2023
2.96 MB
NTM 03-2023 -Al Dhafra Region Ports Marine Bathymetric Survey Operations – Jebel Dhanna (Cancelled)
03/03/2023
483.68 KB
NTM-02-2023 Hudayriyat-Mussafah Causeway – Work In Progress (Cancelled)
03/02/2023
821.38 KB
NTM 01-2023 – New Musaffah Channel-Construction of Hudayriyat-Deployment of AtoN (Cancelled)
02/01/2023
926.93 KB
NTM 17-2022 – New Musaffah Channel-Construction of Hudayriyat (Cancelled)
15/12/2022
823.11 KB
NTM-16-2022- Al Mugharraq Port Northern Channel – Aids to Navigation (Cancelled)
09/12/2022
757.80 KB
15/2022 Khalifa Port Development – New Logistic Port and Inner Navigational Channel (Cancelled)
30/11/2022
965.73 KB
NTM-14-2022 – Mugharraq Port Limits – Cable Laying Operations (Cancelled)
02/11/2022
930.50 KB
NTM-13-2022 – Al Mirfa Port-Sea Trails of Unmanned Remotely Operated Boat (Cancelled)
31/10/2022
1.04 MB
NTM-10-2022 – Cancelation of NTM 02-2021 – Khalifa Port Basin (Cancelled)
16/08/2022
634.11 KB
NTM-09-2022 – Cancellation of NTM 07-2022 -Underwater Operation – NFP (Cancelled)
10/08/2022
748.33 KB
NTM-02-2022 – Mugharraq Port – Marine Bathymetric Survey Operations (Cancelled)
17/02/2022
944.28 KB
NTM-01-2022-MP-Seismic Survey Operations in Musaffah Navigation Channels (Cancelled)
25/01/2022
618.74 KB
NTM 16 – 2021 Mugharraq Port Development – New Quay Wall & Entrance Channel (Cancelled)
21/12/2021
919.66 KB
Notice to Mariners 11-2021- Khalifa Port – Seismic Survey Ops (Cancelled)
07/07/2021
1.53 MB
NTM 10-2021 – Enhanced Vessel Movements Measures at Khalifa Port (Cancelled)
09/06/2021
622.80 KB
NTM 09-2021 – ZP MP outer Anchorages Designated area Seismic Survey Operations (Cancelled)
30/05/2021
1.50 MB
NTM 06/2021 ZP Channel & Anchorage area – Seismic Survey Operations (Cancelled)
14/03/2021
1.28 MB
NTM 05-2021 Mugharag Port – Deployment of Navigational Buoys (Cancelled)
10/03/2021
948.29 KB
04/2021 Cancellation of NTM 09-2020 – Mugharag SBY Channel – Navigation Buoy Missing (Cancelled)
07/03/2021
1.34 MB
NTM 02/2021 KP Basin – Dredging Works Sinker Pipeline Deployment (Cancelled)
11/02/2021
1.29 MB
NTM 08/2020 Demolition of Mena Plaza Towers Freeport Zayed Port (Cancelled)
22/11/2020
1.06 MB
NTM 07/2020 Zayed – Musaffah Ports Outer Anchorage Areas & Freeport Channel (Cancelled)
05/11/2020
1.28 MB
NTM 06/2020 Musaffah Port Anchorage S2 Area – Seismic Survey Ops (Cancelled)
20/09/2020
1.32 MB
KP – Amendment to the Port NTM no 01-20 – KP Anchorage Area – Seismic Survey Ops
30/08/2020
1.25 MB
Amendmen to the Port NTM no 05-20-Khalifa Port Anchorage Area – Seismic Survey Ops (Cancelled)
23/05/2020
1.25 MB
Notice to Mariners 02-20 – Mugharag Port – Channel Basin – Dredging Work (Cancelled)
23/02/2020
994.93 KB
Notice to Mariners 01-20 – Khalifa Port Anchorage Area – Seismic Survey Ops (Cancelled)
23/01/2020
1.24 MB
Notice to Mariners 06-18 – Khalifa Port Basin Dredging & Marine Works Development (Cancelled)
16/08/2018
1.74 MB
Notice to Mariners 05-18 – Khalifa Port – Channel Enhancement Projects (Cancelled)
16/08/2018
2.03 MB
Notice to Mariners 04-18 – Khalifa Pot – Fairway Buoy New Position (Cancelled)
10/06/2018
633.75 KB
Marine Notice 03-2018 – The Mandatory Installation and Operation of the AIS System
20/02/2018
988.01 KB
Marine Notice 02-2018 – Oil and Products Cargoes Operations Conditions
18/01/2018
980.04 KB
Marine Notice 07-2017 – Al Dhafra Region Ports Pilotage Directions-Amendment (Cancelled)
06/12/2017
240.59 KB
Marine Notice 05-2017 – Khalifa Port – Inner Harbour Channel (Cancelled)
24/08/2017
805.48 KB
Marine Notice 04-2017 – Installation of new buoys in ICAD area – Musaffah Port
05/04/2017
202.81 KB
Marine Notice 04-2016 – Project Operational Special Areas Khalifa Port (Cancelled)
08/11/2016
581.59 KB
Marine Notice 02-2016 – Clearing Wreckage site – ICAD Basin (Musaffah Port)
06/03/2016
154.00 KB
Marine Notice 08-2015 – Mina Zayed – Sas Al Nakhl Aids to Navigation (Cancelled)
21/10/2015
214.40 KB
Marine Notice 04-2012 – ROPME Sea Areas Ballast Water Management Requirements
16/09/2014
1.32 MB
Marine Notice 02-2013 – Sheikh Khalifa Bridge Saadiyat Bridge Air Draught Limitations
03/02/2013
737.96 KB
NTM 05-2010 – Safety of Navigation – Mina Zayed (Correction) (Cancelled)
23/05/2010
1.98 MB
NTM 02-2010-UN Security resolutions concerning trade with Iran (Cancelled)
10/02/2010
1.02 MB