Super-heavy load was offloaded at Mina Zayed
A super-heavy load was offloaded at Mina Zayed prior to being shipped to Musaffah Port. The 1,250 ton equipment arrived from South Korea and is destined for GASCO’s (Abu Dhabi Gas Industries) gas processing plant – Habshan 5 – in Ruwais in the west of the Emirate.
Related posts
April 19, 2024
Most Viewed
Featured Articles
July 5, 2021